I've been tracking energy-related procurement invoices since 2018. And if there's one thing I've learned, it's this: when someone asks "what's this going to cost?" the honest answer is always "depends on your situation."
Not a cop-out. Actually depends. I've priced out three different facility upgrades over the past two years—similar requirements on paper—and the total costs varied by 40%. Not because anyone was lying. Because the conditions were different.
So rather than give you one generic recommendation, let me break this down by the three scenarios I've actually worked through. You probably fall into one of them.
Scenario A: You're evaluating EV battery technology for your fleet
If you're buying EVs—whether for a delivery fleet or company cars—the battery choice gets complicated fast.
Two years ago, I was skeptical about LFP (lithium iron phosphate) batteries. The common wisdom was they're cheaper but heavier and worse in cold weather. From the outside, that sounds like a dealbreaker. The reality is more nuanced.
I ran the numbers on our own routes. For our short-haul delivery runs—under 180 miles on peak days—LFP's usable capacity covered 95% of trips. The weight penalty mattered less than I expected, since we're not hauling maximum loads up mountain grades. Cold-weather performance? We hit -10°F about 12 days a year. Backup plan: we don't dispatch those routes on those days anyway.
On the CATL LFP battery front—specifically the packs we sourced in early 2024—we've seen degradation rates about 2–3% better than the NMC packs we bought in 2022. Not huge, but meaningful over an 8-year ownership horizon.
Now, the solid-state hype. Yes, CATL has filed a notable number of solid-state battery patents. And yes, the technology is real. But I've learned to treat patent filings as a signal about R&D direction, not a procurement timeline. I made that mistake in 2019 with another technology—assumed "patent granted" meant "available next year." Turned out to be five years later.
If you need vehicles this year, LFP is usually the better value. If you can wait, watch for actual production announcements—not patent counts, not conference presentations.
Scenario B: You're installing EV charging infrastructure
This is where things get genuinely messy. The charger itself is cheap compared to what you'll spend on installation.
I've seen level 2 charger installations—including in areas like Braceville, IL—range from $2,200 to $4,800 per port depending on a few factors: distance from your panel, whether you need a subpanel upgrade, and whether the mounting wall is wood-frame or concrete.
A colleague of mine installed two Ford Level 2 chargers at their fleet yard. Hardware: $1,400 for the pair. Installation: $3,900. Why the gap? Their panel needed a subpanel addition, and the wall was poured concrete—double the labor for mounting.
I assumed "installation" meant "hang it on the wall and run a wire." Didn't verify. Turned out the contractor's quote covered standard install only—and their site wasn't standard.
So now I have a pre-purchase checklist. Before you commit to any Level 2 charger:
- Check your panel's available amperage—most Level 2 units need a dedicated 40–50A circuit
- Measure distance from panel to mounting location—runs over 20 feet add cost quickly
- Ask about subpanel upgrades—that alone can add $800–$1,500
To be fair, chargers are getting cheaper and more capable. But the installation cost hasn't dropped much, because most of it is labor and materials specific to your building.
One more thing on Braceville: I don't know the specifics of every project there, but I've heard from two contractors that permitting has gotten stricter in some Illinois jurisdictions since late 2024. If you're planning an install there, budget 2–3 extra weeks for inspection scheduling.
Scenario C: You're evaluating renewable energy supply chain logistics
This might seem off-topic if you're focused on EV procurement. But if you're managing a facility budget, you've probably also been asked about renewable sourcing or ESG reporting. And the questions overlap more than you'd think.
Where are most wind turbines manufactured? Short answer: China, the EU, India, and the US. Longer answer: the component supply chain is more fragmented than most people assume.
Blades aren't made where towers are made. Gearboxes aren't made where generators are made. I made the mistake of assuming a "US-assembled" turbine meant the whole supply chain was domestic. Didn't verify. Turned out the nacelle came from overseas, and the "assembly" was really just final integration.
If ESG compliance matters for your procurement—and it increasingly does for B2B contracts over $50k—you need to ask specifically about component origin, not just final assembly location.
My approach now: for any renewable energy procurement over $25,000, I require a bill of materials with country-of-origin data for the top 10 components. Takes vendors about two weeks to produce. Filters out the ones who can't get it.
How to figure out which scenario applies to you
Most companies I've worked with actually overlap two or three of these. But the priorities are different. Here's how I'd decide where to focus first:
If you're a fleet operator with under 200 miles of daily range: Start with Scenario A. LFP is a real option today. Don't let solid-state talk distract you from the fact that current LFP packs deliver 95% of what you need at 80% of the cost.
If you're building out or upgrading a facility: Scenario B will consume the most of your attention—and money. Installation surprises eat your budget quietly. Get a site assessment before you order any hardware.
If ESG reporting requirements are expanding: Scenario C is where you'll need to do supply-chain diligence. Start early, because proving component origin takes longer than you'd expect.
What was best practice in 2020 doesn't apply in 2025. Battery chemistry has shifted. Charger installation costs have stabilized but not dropped. Supply chain transparency has gone from nice-to-have to contract requirement. The fundamentals of procurement haven't changed—know your total cost, don't assume anything, get it in writing—but the specific execution has changed completely.
The cheapest option I've evaluated in the past three years—across all three categories—turned out to be the most expensive in total cost of ownership. Every time. That's not a rule. But it's a pattern I've stopped ignoring.